Installing solar panels in your home?

First. What is the electricity tariff now? “If it exceeds 5–7 rubles with VAT per 1 kWh, then the savings effect will be very sensitive. If it is lower, then the savings will be, but not so noticeable (the higher the price of buying energy from the network, the more efficient such an installation will be) “, – specify in the press service of the Ministry of Energy of the Solar companies in Australia. Second. Is it possible to install a solar station (a separate building with a free roof without shading from other objects or a free land plot) and what is the available area?

From calculations.

For example, to install a private solar power plant for a household with a capacity of 5 kW, about 30 square meters are need of free roof area, orient to the south. A plant with a capacity of 5 kW will generate about 5 thousand kWh per year in the conditions of the Moscow Region or about 7 thousand kWh in the conditions of the Krasnodar Territory. Based on these indicators and your tariff, you can calculate the annual savings from installing SES.

How to choose equipment?

I consulted with a company on the development and implementation of energy-saving solutions, I also studied materials and reviews myself as for the plates: at that time, I also chose the inverter from the market leader over the years there has been huge progress. First of all, in ion batteries. Today you can choose much more profitable options – I mean plates in tile format. In those years, they were very hot. But a single-crystal plate is better if you have a lot of cloudy days in the region. Analyze the current insolation. “Before purchasing equipment for a solar power plant, you can contact specialists for advice – local or federal companies that provide selection and installation services,” the Ministry of Energy of the Solar Panel Price in Australia advises.

Permissions are not required.

But if the owner of microgeneration wants to conclude an agreement with the power supply company for the sale of surplus, then he needs to draw up technical conditions in the power grid company and conclude an agreement with the power supply company.

 

  • Briefly, the procedure looks like this:
  • Filing an application for connection to a network company;
  • Conclusion of an agreement (agreement) with a power supply company (guaranteeing supplier).

Installation of a two-way counter.

The cost of connecting such an object the Ministry. Energy clarifies that “to date, there has not been much activity in connecting microgeneration facilities to the grid.” Judging by the reviews on the Internet, the procedure has not yet taken root. “I know that people either face failures when trying to connect, or a lot of unresolved issues. It seems that today the power grids do not offer consumers a ready-made solution.

Who Should Maintain Solar Panels? Is it possible to call a master from a municipal institution?

No, today the installation and maintenance of solar power plants is not included in the list of services of these institutions. Therefore, it is important that the warranty period is longer. However, if the power plant is well made, problems should not appear in the first few years.

Which buildings are more likely to use solar panels?

Most of them are in large infrastructure facilities. The share of private houses does not exceed 0.5% (~8–10 MW) of the total capacity of installed. All of these facilities are equipped with network solar power plants. Many of them can be connected to power grids within the framework. The law on microgeneration (with the issuance of up to 15 kW to the general grid).

Which regions have the most solar power plants?

The largest share of solar generation in the South of Australia.

Many are convince that there is very little sun in Australia and it makes no sense to install solar panels in most regions. But, according to the Ministry of Energy of the Australian Federation, all installed stations are now paying off, including in regions where there are relatively few sunny days. Insolation, or the specific generation of 1 kW, in Australia varies from 800 kWh per year in Murmansk and up to 1,500 kWh per year in the Trans-Baikal Territory,” responded in the department to a request from TASS.